Island & Off Grid

IO Job 15
Surfboard Storage and Maintenance Building
Customer goal: Off grid building needed power for lights, fans and tools. Result: Building is operational with no backup power.
Read more.
IO Job 14
72KW Off-Grid Battery Primary Install-Bahamas
Customer goal: Reduce Diesel consumption by 70% or more on an off-grid island in the Exumas. System currently powering a
Read more.
IO Job 13
5-Star Island Resort Off of Panama
Customer goal: Build the first five star resort that is completely powered by solar. Result: Mission Accomplished. Design: Computer controlled
Read more.
IO Job 12
Sugarlands Visitor Center- Smoky Mtn. National Park
Customer goal: Repurpose 40 55 watt solar panels that were installed in 1994 so they can be reused to help
Read more.
IO Job 11
Cable Mill at Cades Cove- Smoky Mtn. National Park
Customer goal: Use excess power to pump water to large storage tank to fill needs for Cable Mill area without
Read more.
IO Job 10
Cable Mill at Cades Cove- Smoky Mtn. National Park
     Customer goal: Stop generator run time during the day, Save 75% of the fuel costs, cut generator maintenance and
Read more.
IO Job 9
Rural Alabama Four Power Source Waterfront Home
Customer goal: Cut electric bill to almost nothing in a state where net metering is not true net AND allow
Read more.
IO Job 7
Private Island
Customer goal: Have power available during construction without running a generator all the time and then add renewable energy. Result:
Read more.
IO Job 5
Smokey Mountain National Park
  Customer goal: Reduce propane bill and maintenance bill for generator while providing a more quiet environment for visitors of
Read more.
IO Job 4
Haiti not-for-profit farm near of Port Au Prince
Customer goal: Expand 10 year old Not-for-Profit farm with less reliance on the diesel supply and to show the local
Read more.
IO Job 1
National Park Services at Adam’s Key
  Customer goal: Reduce Diesel consumption by 90% or more on an off grid island. Result: The system is performing
Read more.
Tropical Shipping, St Thomas USVI
Customer goal: Lower energy use on Tropical Shipping’s Facility in St Thomas USVI. Result: Solar  was operational for several mounts
Read more.
Comm Job 5
Off-grid Solar Path Lighting, City of Tamarac
Customer goal: Light a jogging/walking trail without tearing up the entire park to add wiring Result: 35 stand alone solar
Read more.
Job 39
Private Island off of the Lower Keys
  Customer goal: Eliminate as much as possible of a $11,000 average propane bill per month (no diesel allowed). They
Read more.